AH constructed about seven big projects in Iraq with values range from 1,000,000 to 38,000,000 USD. About 200,000 meter length of UPVC gravity lines with depth from 1 to 6 meter and diameter from 100 to 1200mm including casting and install about 4000 concrete manholes were installed for a period from 2005 to 2014 in different areas in Iraq . These projects also include installation about 10,000 meter length of force main with diameter from 250 to 1000mm using Ductile iron, high pressure PVC, GRP, HDPE, and HDPE Corrugated pipes materials. Moreover, about 20,000 house connection were installed to connect the houses with networks, in addition to construction pump stations. The first project handed over to client since end of 2006 and from that time the networks work successfully with high degree with reliability, the same for recent handed over projects.